Smokey Hollow Solar (1679)

Smokey Hollow Solar is a 70.0 MW other interconnection project in Wyoming, New York with a current status of withdrawn. It is proposed to connect at South Perry to Indeck Silver Springs Energy Center 115k, Line 101.

70.0 MWCapacity
WithdrawnStatus
CMarket
OtherTechnology

Project facts

Canonical nameSmokey Hollow Solar
Queue ID1679
Statuswithdrawn
Source status0
MarketC
TechnologyOther
Capacity70.0 MW
StateNew York
CountyWyoming
Point of interconnectionSouth Perry to Indeck Silver Springs Energy Center 115k, Line 101
Requested (queue) date2024-03-11
Proposed in-service date2024-05-31
Operational date
Withdrawn date
DeveloperSR1 Shift NY I
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.