Smoky Hills Tap 230kV (GEN-2021-013)

Smoky Hills Tap 230kV is a 74.9 MW battery interconnection project in Lincoln, Kansas with a current status of withdrawn. It is proposed to connect at Smoky Hills Tap 230kV.

74.9 MWCapacity
WithdrawnStatus
KSMarket
BatteryTechnology

Project facts

Canonical nameSmoky Hills Tap 230kV
Queue IDGEN-2021-013
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyBattery
Capacity74.9 MW
StateKansas
CountyLincoln
Point of interconnectionSmoky Hills Tap 230kV
Requested (queue) date2021-04-30
Proposed in-service date2025-12-31
Operational date
Withdrawn date2024-10-08
Developer
Utility / transmission ownerMIDW

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata