Lincoln County, Kansas — Interconnection Projects

The interXdata warehouse tracks 8 interconnection projects in Lincoln, Kansas, representing 333 MW of requested capacity.

8Total projects
0Active
6Operational
1Withdrawn
333 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Wind2249 MW
Battery175 MW
Other59 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Smoky Hills Wind Project Phase II56985_SMKIIWind148.5 MWoperationalLincoln, Kansas
Smoky Hills Wind Project Phase I56488_1Wind100.8 MWoperationalLincoln, Kansas
Smoky Hills Tap 230kVGEN-2021-013Battery74.9 MWwithdrawnLincoln, Kansas
Lincoln1300_7Other3.5 MWoperationalLincoln, Kansas
Lincoln1300_8Other2.0 MWoperationalLincoln, Kansas
Lincoln1300_2Other1.3 MWoperationalLincoln, Kansas
Lincoln1300_1Other1.3 MWoperationalLincoln, Kansas
Lincoln1300_4Other0.7 MWsuspendedLincoln, Kansas

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Lincoln County.

Start tracking with interXdata