Snake Spring-Bedford Area 23 kV (AF2-092)

Snake Spring-Bedford Area 23 kV is a 12.0 MW solar interconnection project in Bedford, Pennsylvania with a current status of withdrawn.

12.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameSnake Spring-Bedford Area 23 kV
Queue IDAF2-092
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity12.0 MW
StatePennsylvania
CountyBedford
Point of interconnection
Requested (queue) date2020-02-11
Proposed in-service date2026-08-11
Operational date
Withdrawn date2026-01-15
Developer
Utility / transmission ownerPENELEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.