Snyder 345 kV (J1180/J1475 POI) (J2170)

Snyder 345 kV (J1180/J1475 POI) is a 150.0 MW battery interconnection project in Clark, Illinois with a current status of operational. It is proposed to connect at Snyder 345 kV (J1180/J1475 POI).

150.0 MWCapacity
OperationalStatus
Market
BatteryTechnology

Project facts

Canonical nameSnyder 345 kV (J1180/J1475 POI)
Queue IDJ2170
Statusoperational
Source statusPending Transfer
Market
TechnologyBattery
Capacity150.0 MW
StateIllinois
CountyClark
Point of interconnectionSnyder 345 kV (J1180/J1475 POI)
Requested (queue) date2022-04-05
Proposed in-service date2024-01-01
Operational date2024-01-01
Withdrawn date
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata