Snyder 345 kV (J1180/J1475 POI) (J2170)
Snyder 345 kV (J1180/J1475 POI) is a 150.0 MW battery interconnection project in Clark, Illinois with a current status of operational. It is proposed to connect at Snyder 345 kV (J1180/J1475 POI).
150.0 MWCapacity
OperationalStatus
—Market
BatteryTechnology
Project facts
| Canonical name | Snyder 345 kV (J1180/J1475 POI) |
|---|---|
| Queue ID | J2170 |
| Status | operational |
| Source status | Pending Transfer |
| Market | — |
| Technology | Battery |
| Capacity | 150.0 MW |
| State | Illinois |
| County | Clark |
| Point of interconnection | Snyder 345 kV (J1180/J1475 POI) |
| Requested (queue) date | 2022-04-05 |
| Proposed in-service date | 2024-01-01 |
| Operational date | 2024-01-01 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | AMEREN ILLINOIS |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata