Snyder 69kV (AE2-181)

Snyder 69kV is a 49.0 MW solar interconnection project in Williams, Ohio with a current status of operational.

49.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameSnyder 69kV
Queue IDAE2-181
Statusoperational
Source statusIn Service
Market
TechnologySolar
Capacity49.0 MW
StateOhio
CountyWilliams
Point of interconnection
Requested (queue) date2019-03-18
Proposed in-service date
Operational date2025-12-31
Withdrawn date
Developer
Utility / transmission ownerATSI

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata