Sol Marina Energy Center BESS (26INR0242)

Sol Marina Energy Center BESS is a 57.1 MW other interconnection project in Ellis, Texas with a current status of operational. It is proposed to connect at Tap 345kV 2427 Watermill - 2466 Big Onion.

57.1 MWCapacity
OperationalStatus
EllisMarket
OtherTechnology

Project facts

Canonical nameSol Marina Energy Center BESS
Queue ID26INR0242
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketEllis
TechnologyOther
Capacity57.1 MW
StateTexas
CountyEllis
Point of interconnectionTap 345kV 2427 Watermill - 2466 Big Onion
Requested (queue) date2023-10-25
Proposed in-service date
Operational date2032-12-30
Withdrawn date
DeveloperAdapture Solar Development
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata