Sol Marina Energy Center BESS (26INR0242)

Sol Marina Energy Center BESS is a 57.1 MW battery interconnection project in Ellis, Texas with a current status of withdrawn.

57.1 MWCapacity
WithdrawnStatus
EllisMarket
BatteryTechnology

Project facts

Canonical nameSol Marina Energy Center BESS
Queue ID26INR0242
Statuswithdrawn
Source status—
MarketEllis
TechnologyBattery
Capacity57.1 MW
StateTexas
CountyEllis
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date—
Withdrawn date2026-07-06
Developer—
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-31developerAdapture Solar Development, LLC—low
2026-08-31poi_nameTap 345kV 2427 Watermill - 2466 Big Onion—low
2026-08-31phaseSS Completed, FIS Completed, IA—low
2026-08-31ia_signed_date2025-04-25—medium
2026-08-31operational_date2032-12-30—medium
2026-08-31withdrawn_date—2026-07-06high
2026-08-31statusoperationalwithdrawnhigh
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-09-30
Data last materially changed2026-08-31
Page data generated2026-10-11

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.