Sol Marina Energy Center BESS (26INR0242)
Sol Marina Energy Center BESS is a 57.1 MW battery interconnection project in Ellis, Texas with a current status of withdrawn.
57.1 MWCapacity
WithdrawnStatus
EllisMarket
BatteryTechnology
Project facts
| Canonical name | Sol Marina Energy Center BESS |
|---|---|
| Queue ID | 26INR0242 |
| Status | withdrawn |
| Source status | — |
| Market | Ellis |
| Technology | Battery |
| Capacity | 57.1 MW |
| State | Texas |
| County | Ellis |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | 2026-07-06 |
| Developer | — |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-31 | developer | Adapture Solar Development, LLC | — | low |
| 2026-08-31 | poi_name | Tap 345kV 2427 Watermill - 2466 Big Onion | — | low |
| 2026-08-31 | phase | SS Completed, FIS Completed, IA | — | low |
| 2026-08-31 | ia_signed_date | 2025-04-25 | — | medium |
| 2026-08-31 | operational_date | 2032-12-30 | — | medium |
| 2026-08-31 | withdrawn_date | — | 2026-07-06 | high |
| 2026-08-31 | status | operational | withdrawn | high |
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-09-30
Data last materially changed2026-08-31
Page data generated2026-10-11
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.