Sol Marina SLF Energy Center (26INR0241)

Sol Marina SLF Energy Center is a 171.1 MW solar interconnection project in Ellis, Texas with a current status of operational. It is proposed to connect at Tap 345kV Stainback Switch (bus# 2217) – Big Onion Switch (bus# 2466).

171.1 MWCapacity
OperationalStatus
EllisMarket
SolarTechnology

Project facts

Canonical nameSol Marina SLF Energy Center
Queue ID26INR0241
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketEllis
TechnologySolar
Capacity171.1 MW
StateTexas
CountyEllis
Point of interconnectionTap 345kV Stainback Switch (bus# 2217) – Big Onion Switch (bus# 2466)
Requested (queue) date2023-10-25
Proposed in-service date—
Operational date2027-10-29
Withdrawn date—
DeveloperSol Marina Energy Center, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-30poi_nameTap 345kV 2427 Watermill - 2466 Big OnionTap 345kV Stainback Switch (bus# 2217) – Big Onion Switch (bus# 2466)low
2026-09-30phaseSS Completed, FIS Completed, IASS Completed, FIS Started, IAlow
2026-09-30capacity_mw175.3171.09high
2026-08-31developerAdapture Solar Development, LLCSol Marina Energy Center, LLClow
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-09-30
Data last materially changed2026-09-30
Page data generated2026-10-11

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata