Solar + Battery Storage (1128)

Solar + Battery Storage is a 4.5 MW solar+battery interconnection project in Berkshire, Massachusetts with a current status of withdrawn. It is proposed to connect at Eversource 22.8Kv feeder 15E2 Name of substation = Partridge 15E substation.

4.5 MWCapacity
WithdrawnStatus
WMAMarket
Solar+BatteryTechnology

Project facts

Canonical nameSolar + Battery Storage
Queue ID1128
Statuswithdrawn
Source statusW
MarketWMA
TechnologySolar+Battery
Capacity4.5 MW
StateMassachusetts
CountyBerkshire
Point of interconnectionEversource 22.8Kv feeder 15E2 Name of substation = Partridge 15E substation
Requested (queue) date2021-04-21
Proposed in-service date2022-07-15
Operational date
Withdrawn date2022-09-12
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata