Solar CNR only (643)
Solar CNR only is a 20.0 MW solar interconnection project in New Haven, Connecticut with a current status of withdrawn. It is proposed to connect at CT_NU 115 kV Line from Wallingford to NU_1208_WAL. Proposed POI is located at 41° 26’ 27.9” N , 72° 50’36.6” W (see the attached site layout drawing)..
20.0 MWCapacity
WithdrawnStatus
CTMarket
SolarTechnology
Project facts
| Canonical name | Solar CNR only |
|---|---|
| Queue ID | 643 |
| Status | withdrawn |
| Source status | W |
| Market | CT |
| Technology | Solar |
| Capacity | 20.0 MW |
| State | Connecticut |
| County | New Haven |
| Point of interconnection | CT_NU 115 kV Line from Wallingford to NU_1208_WAL. Proposed POI is located at 41° 26’ 27.9” N , 72° 50’36.6” W (see the attached site layout drawing). |
| Requested (queue) date | 2017-04-27 |
| Proposed in-service date | 2018-12-31 |
| Operational date | — |
| Withdrawn date | 2017-05-23 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata