Solar (1245)

Solar is a 150.0 MW solar interconnection project in Hartford, Connecticut with a current status of active. It is proposed to connect at 345kV Line 3419 Tap between Meekville Junction/Barbour Hill (PSSE Bus Number: 119103) To LudlowPSSE Bus Number: 116045).

150.0 MWCapacity
ActiveStatus
CTMarket
SolarTechnology

Project facts

Canonical nameSolar
Queue ID1245
Statusactive
Source statusA
MarketCT
TechnologySolar
Capacity150.0 MW
StateConnecticut
CountyHartford
Point of interconnection345kV Line 3419 Tap between Meekville Junction/Barbour Hill (PSSE Bus Number: 119103) To LudlowPSSE Bus Number: 116045)
Requested (queue) date2022-03-31
Proposed in-service date2028-10-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.