Solar (1247)

Solar is a 25.0 MW solar interconnection project in Hartford, Connecticut with a current status of active. It is proposed to connect at To interconnect at the POI of Gravel Pit Solar QP 1030, via a Shared Facility, QP 1030 is described as a line cut and three-breaker ring bus of the 115 kV Connecticut Light & Power Company line between Barbour Hill and Windsor Locks..

25.0 MWCapacity
ActiveStatus
CTMarket
SolarTechnology

Project facts

Canonical nameSolar
Queue ID1247
Statusactive
Source statusA
MarketCT
TechnologySolar
Capacity25.0 MW
StateConnecticut
CountyHartford
Point of interconnectionTo interconnect at the POI of Gravel Pit Solar QP 1030, via a Shared Facility, QP 1030 is described as a line cut and three-breaker ring bus of the 115 kV Connecticut Light & Power Company line between Barbour Hill and Windsor Locks.
Requested (queue) date2022-04-05
Proposed in-service date2027-11-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.