Solar (629)

Solar is a 20.0 MW solar interconnection project in New Haven, Connecticut with a current status of withdrawn. It is proposed to connect at CT_NU 115 kV Line from Wallingford to NU_1208_WAL. Proposed POI is located at 41° 26’ 27.9” N , 72° 50’36.6” W (see the drawing with file name "Project Facility Layout - 22NOV16.pdf" for a map of proposed POI location)..

20.0 MWCapacity
WithdrawnStatus
CTMarket
SolarTechnology

Project facts

Canonical nameSolar
Queue ID629
Statuswithdrawn
Source statusW
MarketCT
TechnologySolar
Capacity20.0 MW
StateConnecticut
CountyNew Haven
Point of interconnectionCT_NU 115 kV Line from Wallingford to NU_1208_WAL. Proposed POI is located at 41° 26’ 27.9” N , 72° 50’36.6” W (see the drawing with file name "Project Facility Layout - 22NOV16.pdf" for a map of proposed POI location).
Requested (queue) date2017-03-07
Proposed in-service date2018-12-31
Operational date
Withdrawn date2017-05-23
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata