Solar is a 26.0 MW solar interconnection project in Hartford, Connecticut with a current status of withdrawn. It is proposed to connect at Interconnection to existing 115 kV transmission line running across the property between Eversources's Barbour Hill Substation and Endfield Substation..
26.0 MWCapacity
WithdrawnStatus
CTMarket
SolarTechnology
Project facts
| Canonical name | Solar |
|---|---|
| Queue ID | 671 |
| Status | withdrawn |
| Source status | W |
| Market | CT |
| Technology | Solar |
| Capacity | 26.0 MW |
| State | Connecticut |
| County | Hartford |
| Point of interconnection | Interconnection to existing 115 kV transmission line running across the property between Eversources's Barbour Hill Substation and Endfield Substation. |
| Requested (queue) date | 2017-07-26 |
| Proposed in-service date | 2019-12-01 |
| Operational date | — |
| Withdrawn date | 2017-10-25 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata