Solar (718)

Solar is a 6.0 MW solar interconnection project in New London, Connecticut with a current status of withdrawn. It is proposed to connect at Eversource 13B25 Feeder.

6.0 MWCapacity
WithdrawnStatus
CTMarket
SolarTechnology

Project facts

Canonical nameSolar
Queue ID718
Statuswithdrawn
Source statusW
MarketCT
TechnologySolar
Capacity6.0 MW
StateConnecticut
CountyNew London
Point of interconnectionEversource 13B25 Feeder
Requested (queue) date2018-02-21
Proposed in-service date2019-04-02
Operational date
Withdrawn date2018-03-02
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata