Solar (788)
Solar is a 19.9 MW solar interconnection project in New London, Connecticut with a current status of withdrawn. It is proposed to connect at Primary POI - Eversource Montville Plant 69 kV switchyard via new breaker position. Alternate POI - New 34.5 kV breaker position at Mohegan Tribal Utility Authority (MTUA) Fort Hill Substation..
Project facts
| Canonical name | Solar |
|---|---|
| Queue ID | 788 |
| Status | withdrawn |
| Source status | W |
| Market | CT |
| Technology | Solar |
| Capacity | 19.9 MW |
| State | Connecticut |
| County | New London |
| Point of interconnection | Primary POI - Eversource Montville Plant 69 kV switchyard via new breaker position. Alternate POI - New 34.5 kV breaker position at Mohegan Tribal Utility Authority (MTUA) Fort Hill Substation. |
| Requested (queue) date | 2018-09-28 |
| Proposed in-service date | 2023-12-31 |
| Operational date | — |
| Withdrawn date | 2022-09-09 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.