Solar is a 19.9 MW solar interconnection project in New London, Connecticut with a current status of withdrawn. It is proposed to connect at Primary POI - Eversource Montville Plant 69 kV switchyard via new breaker position. Alternate POI - New 34.5 kV breaker position at Mohegan Tribal Utility Authority (MTUA) Fort Hill Substation..

19.9 MWCapacity
WithdrawnStatus
CTMarket
SolarTechnology

Project facts

Canonical nameSolar
Queue ID788
Statuswithdrawn
Source statusW
MarketCT
TechnologySolar
Capacity19.9 MW
StateConnecticut
CountyNew London
Point of interconnectionPrimary POI - Eversource Montville Plant 69 kV switchyard via new breaker position. Alternate POI - New 34.5 kV breaker position at Mohegan Tribal Utility Authority (MTUA) Fort Hill Substation.
Requested (queue) date2018-09-28
Proposed in-service date2023-12-31
Operational date
Withdrawn date2022-09-09
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata