Solar (932)
Solar is a 110.0 MW solar interconnection project in Carroll, New Hampshire with a current status of withdrawn. It is proposed to connect at 115 kV Eversource K1214 line between Saco Valley and Lovell, approximately 3.46 miles from Saco Valley..
110.0 MWCapacity
WithdrawnStatus
MEMarket
SolarTechnology
Project facts
| Canonical name | Solar |
|---|---|
| Queue ID | 932 |
| Status | withdrawn |
| Source status | W |
| Market | ME |
| Technology | Solar |
| Capacity | 110.0 MW |
| State | New Hampshire |
| County | Carroll |
| Point of interconnection | 115 kV Eversource K1214 line between Saco Valley and Lovell, approximately 3.46 miles from Saco Valley. |
| Requested (queue) date | 2019-10-22 |
| Proposed in-service date | 2025-10-03 |
| Operational date | — |
| Withdrawn date | 2022-11-23 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata