Solar is a 110.0 MW solar interconnection project in Carroll, New Hampshire with a current status of withdrawn. It is proposed to connect at 115 kV Eversource K1214 line between Saco Valley and Lovell, approximately 3.46 miles from Saco Valley..

110.0 MWCapacity
WithdrawnStatus
MEMarket
SolarTechnology

Project facts

Canonical nameSolar
Queue ID932
Statuswithdrawn
Source statusW
MarketME
TechnologySolar
Capacity110.0 MW
StateNew Hampshire
CountyCarroll
Point of interconnection115 kV Eversource K1214 line between Saco Valley and Lovell, approximately 3.46 miles from Saco Valley.
Requested (queue) date2019-10-22
Proposed in-service date2025-10-03
Operational date
Withdrawn date2022-11-23
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata