Carroll County, New Hampshire — Interconnection Projects

The interXdata warehouse tracks 4 interconnection projects in Carroll, New Hampshire, representing 239 MW of requested capacity.

4Total projects
0Active
2Operational
2Withdrawn
239 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar1110 MW
Solar+Battery185 MW
Other244 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Solar932Solar110.0 MWwithdrawnCarroll, New Hampshire
Solar plus battery storage1036Solar+Battery85.0 MWwithdrawnCarroll, New Hampshire
NE Renewable Tamworth, LLC50739_GEN1Other25.0 MWoperationalCarroll, New Hampshire
White Lake2369_GT1Other18.6 MWoperationalCarroll, New Hampshire

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.