Solar (990)

Solar is a 4.9 MW solar interconnection project in Berkshire, Massachusetts with a current status of withdrawn. It is proposed to connect at Eversource Partidge station.

4.9 MWCapacity
WithdrawnStatus
WMAMarket
SolarTechnology

Project facts

Canonical nameSolar
Queue ID990
Statuswithdrawn
Source statusW
MarketWMA
TechnologySolar
Capacity4.9 MW
StateMassachusetts
CountyBerkshire
Point of interconnectionEversource Partidge station
Requested (queue) date2020-04-09
Proposed in-service date2023-11-30
Operational date
Withdrawn date2025-06-13
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata