Solar plus Battery (1224)

Solar plus Battery is a 1.0 MW solar+battery interconnection project in Worcester, Massachusetts with a current status of withdrawn. It is proposed to connect at National Grid MA 13.8 kV, Whitins Pond 320W5.

1.0 MWCapacity
WithdrawnStatus
CMAMarket
Solar+BatteryTechnology

Project facts

Canonical nameSolar plus Battery
Queue ID1224
Statuswithdrawn
Source statusW
MarketCMA
TechnologySolar+Battery
Capacity1.0 MW
StateMassachusetts
CountyWorcester
Point of interconnectionNational Grid MA 13.8 kV, Whitins Pond 320W5
Requested (queue) date2022-01-25
Proposed in-service date2022-04-29
Operational date
Withdrawn date2022-09-14
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata