Solar with Battery (1162)

Solar with Battery is a 87.0 MW solar+battery interconnection project in Windham, Connecticut with a current status of withdrawn. It is proposed to connect at POI will be the three breaker ring bus at the 1607 Line. Approximate Coordinates 41.7119, -71.9379..

87.0 MWCapacity
WithdrawnStatus
CTMarket
Solar+BatteryTechnology

Project facts

Canonical nameSolar with Battery
Queue ID1162
Statuswithdrawn
Source statusW
MarketCT
TechnologySolar+Battery
Capacity87.0 MW
StateConnecticut
CountyWindham
Point of interconnectionPOI will be the three breaker ring bus at the 1607 Line. Approximate Coordinates 41.7119, -71.9379.
Requested (queue) date2021-09-21
Proposed in-service date2023-12-31
Operational date
Withdrawn date2023-06-01
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata