solar with battery (682)

solar with battery is a 20.0 MW solar+battery interconnection project in Worcester, Massachusetts with a current status of withdrawn. It is proposed to connect at National Grid 13.8kV circuit (E.-Winchendon Substation) on Winchendon Road (near Depot Road), Winchendon, MA.

20.0 MWCapacity
WithdrawnStatus
CMAMarket
Solar+BatteryTechnology

Project facts

Canonical namesolar with battery
Queue ID682
Statuswithdrawn
Source statusW
MarketCMA
TechnologySolar+Battery
Capacity20.0 MW
StateMassachusetts
CountyWorcester
Point of interconnectionNational Grid 13.8kV circuit (E.-Winchendon Substation) on Winchendon Road (near Depot Road), Winchendon, MA
Requested (queue) date2017-09-18
Proposed in-service date2020-12-01
Operational date
Withdrawn date2018-07-24
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata