Sorenson-Desoto 345 kV (AF1-118)

Sorenson-Desoto 345 kV is a 350.0 MW solar interconnection project in Wells, Indiana with a current status of withdrawn.

350.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameSorenson-Desoto 345 kV
Queue IDAF1-118
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity350.0 MW
StateIndiana
CountyWells
Point of interconnection
Requested (queue) date2019-09-13
Proposed in-service date2029-02-15
Operational date
Withdrawn date2025-12-24
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata