South Duke Energy Florida, LLC20 (FC100008)

South Duke Energy Florida, LLC20 is a 100.0 MW battery interconnection project in Highlands, Florida with a current status of active. It is proposed to connect at Avon Park Substation 69 kV.

100.0 MWCapacity
ActiveStatus
FLMarket
BatteryTechnology

Project facts

Canonical nameSouth Duke Energy Florida, LLC20
Queue IDFC100008
Statusactive
Source status10/31/2029 Facili Pti re os S retu ssdy - In
MarketFL
TechnologyBattery
Capacity100.0 MW
StateFlorida
CountyHighlands
Point of interconnectionAvon Park Substation 69 kV
Requested (queue) date2024-12-05
Proposed in-service date
Operational date
Withdrawn date
DeveloperSouth Duke Energy Florida, LLC20
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata