South Foreman 138 kV Substation (GEN-2022-088)

South Foreman 138 kV Substation is a 75.0 MW solar interconnection project in Little River, Arkansas with a current status of withdrawn. It is proposed to connect at South Foreman 138 kV Substation.

75.0 MWCapacity
WithdrawnStatus
ARMarket
SolarTechnology

Project facts

Canonical nameSouth Foreman 138 kV Substation
Queue IDGEN-2022-088
Statuswithdrawn
Source statusWITHDRAWN
MarketAR
TechnologySolar
Capacity75.0 MW
StateArkansas
CountyLittle River
Point of interconnectionSouth Foreman 138 kV Substation
Requested (queue) date2022-11-15
Proposed in-service date2026-09-30
Operational date
Withdrawn date2025-03-25
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata