South Fork 115 Substation (GI-SISS-2025-04)

South Fork 115 Substation is a 79.0 MW battery interconnection project in Kit Carson County, Colorado with a current status of operational. It is proposed to connect at South Fork 115 Substation.

79.0 MWCapacity
OperationalStatus
COMarket
BatteryTechnology

Project facts

Canonical nameSouth Fork 115 Substation
Queue IDGI-SISS-2025-04
Statusoperational
Source statusDISIS STAGE
MarketCO
TechnologyBattery
Capacity79.0 MW
StateColorado
CountyKit Carson County
Point of interconnectionSouth Fork 115 Substation
Requested (queue) date2025-07-25
Proposed in-service date
Operational date2027-09-30
Withdrawn date
Developer
Utility / transmission ownerTSGT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata