South Holland (W4-087)

South Holland is a 3.1 MW gas interconnection project in Cook, Illinois with a current status of withdrawn.

3.1 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameSouth Holland
Queue IDW4-087
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity3.1 MW
StateIllinois
CountyCook
Point of interconnection
Requested (queue) date2011-01-31
Proposed in-service date1998-04-01
Operational date
Withdrawn date2012-12-13
Developer
Utility / transmission ownerComEd

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata