South Morral-Uncapher Switch 69 kV (AH1-572 - moved to TC2)

South Morral-Uncapher Switch 69 kV is a 30.0 MW solar interconnection project in Marion, Ohio with a current status of withdrawn.

30.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameSouth Morral-Uncapher Switch 69 kV
Queue IDAH1-572 - moved to TC2
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity30.0 MW
StateOhio
CountyMarion
Point of interconnection—
Requested (queue) date2021-09-10
Proposed in-service date2024-12-01
Operational date—
Withdrawn date2025-07-03
Developer—
Utility / transmission ownerAEP

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata