South Park 25kV (I18)

South Park 25kV is a 9.9 MW gas interconnection project in Allegheny, Pennsylvania with a current status of withdrawn.

9.9 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameSouth Park 25kV
Queue IDI18
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity9.9 MW
StatePennsylvania
CountyAllegheny
Point of interconnection
Requested (queue) date2002-07-31
Proposed in-service date2003-05-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata