South Plains Wind Phase I (59384_1)

South Plains Wind Phase I is a 200.0 MW wind interconnection project in Floyd, Texas with a current status of operational.

200.0 MWCapacity
OperationalStatus
ERCOMarket
WindTechnology

Project facts

Canonical nameSouth Plains Wind Phase I
Queue ID59384_1
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyWind
Capacity200.0 MW
StateTexas
CountyFloyd
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2015-11-01
Withdrawn date
Developer
Utility / transmission ownerEvergreen Wind, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata