South Portsmouth 138kV (U2-080)

South Portsmouth 138kV is a 134.0 MW other interconnection project in Greenup, Kentucky with a current status of withdrawn.

134.0 MWCapacity
WithdrawnStatus
Market
OtherTechnology

Project facts

Canonical nameSouth Portsmouth 138kV
Queue IDU2-080
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyOther
Capacity134.0 MW
StateKentucky
CountyGreenup
Point of interconnection
Requested (queue) date2008-07-30
Proposed in-service date2011-07-01
Operational date
Withdrawn date2012-07-13
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata