Southeast Queue Project 1 — Solar in an unlisted county, the U.S.

Southeast Queue Project 1 — Solar in an unlisted county, the U.S. is a 74.5 MW solar interconnection project with a current status of operational. It is proposed to connect at Ruskin Substation, Hillsborough County.

74.5 MWCapacity
OperationalStatus
SoutheastMarket
SolarTechnology

Project facts

Canonical nameSoutheast Queue Project 1 — Solar in an unlisted county, the U.S.
Queue ID1
Statusoperational
Source statusoperational
MarketSoutheast
TechnologySolar
Capacity74.5 MW
State
County
Point of interconnectionRuskin Substation, Hillsborough County
Requested (queue) date2016-08-15
Proposed in-service date2020-02-29
Operational date2020-02-29
Withdrawn date
Developer
Utility / transmission ownerTampa Electric Company

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.