Tampa Electric Company — Interconnection Queue Projects
Tampa Electric Company is associated with 203 tracked interconnection projects representing 15,990 MW of requested capacity.
Entity resolution: this utility / transmission entity rolls up 3 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 145 | 8,512 MW |
| Gas | 40 | 6,967 MW |
| Battery | 16 | 448 MW |
| Other | 2 | 63 MW |
Geographic footprint
| State | Projects |
|---|---|
| Florida | 200 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| FL Queue Project 124 — Gas in Hillsborough, Florida | 124 | Gas | 608.0 MW | active | Hillsborough, Florida |
| Polk | 7242_2CC | Gas | 513.0 MW | operational | Polk, Florida |
| Big Bend | 645_ST4 | Gas | 486.0 MW | operational | Hillsborough, Florida |
| H L Culbreath Bayside Power Station | 7873_2ST | Gas | 445.5 MW | operational | Hillsborough, Florida |
| Big Bend | 645_ST1 | Gas | 445.5 MW | operational | Hillsborough, Florida |
| Big Bend | 645_GT6 | Gas | 397.8 MW | operational | Hillsborough, Florida |
| Big Bend | 645_GT5 | Gas | 397.8 MW | operational | Hillsborough, Florida |
| H L Culbreath Bayside Power Station | 7873_1ST | Gas | 239.3 MW | operational | Hillsborough, Florida |
| Polk | 7242_4 | Gas | 199.3 MW | operational | Polk, Florida |
| Polk | 7242_5 | Gas | 199.3 MW | operational | Polk, Florida |
| Polk | 7242_1CT | Gas | 195.0 MW | operational | Polk, Florida |
| H L Culbreath Bayside Power Station | 7873_2D | Gas | 189.9 MW | operational | Hillsborough, Florida |
| H L Culbreath Bayside Power Station | 7873_2C | Gas | 189.9 MW | operational | Hillsborough, Florida |
| H L Culbreath Bayside Power Station | 7873_2A | Gas | 189.9 MW | operational | Hillsborough, Florida |
| H L Culbreath Bayside Power Station | 7873_1B | Gas | 189.9 MW | operational | Hillsborough, Florida |
| H L Culbreath Bayside Power Station | 7873_1C | Gas | 189.9 MW | operational | Hillsborough, Florida |
| H L Culbreath Bayside Power Station | 7873_1A | Gas | 189.9 MW | operational | Hillsborough, Florida |
| H L Culbreath Bayside Power Station | 7873_2B | Gas | 189.9 MW | operational | Hillsborough, Florida |
| FL Queue Project 62 — Gas in Hillsborough, Florida | 62 | Gas | 186.0 MW | operational | Hillsborough, Florida |
| FL Queue Project 82 — Gas in Hillsborough, Florida | 82 | Gas | 186.0 MW | withdrawn | Hillsborough, Florida |
| Polk | 7242_2 | Gas | 175.8 MW | operational | Polk, Florida |
| Polk | 7242_3 | Gas | 175.8 MW | operational | Polk, Florida |
| FL Queue Project 118 — Gas in Polk, Florida | 118 | Gas | 132.0 MW | active | Polk, Florida |
| FL Queue Project 67 — Gas in Hillsborough, Florida | 67 | Gas | 115.0 MW | withdrawn | Hillsborough, Florida |
| Southeast Queue Project 61 — Battery in an unlisted county, the U.S. | 61 | Battery | 95.0 MW | operational | — |
| FL Queue Project 61 — Gas in Hillsborough, Florida | 61 | Gas | 95.0 MW | operational | Hillsborough, Florida |
| FL Queue Project 119 — Battery in Hillsborough, Florida | 119 | Battery | 75.0 MW | active | Hillsborough, Florida |
| FL Queue Project 50 — Solar in Polk, Florida | 50 | Solar | 75.0 MW | withdrawn | Polk, Florida |
| FL Queue Project 49 — Solar in Hillsborough, Florida | 49 | Solar | 75.0 MW | withdrawn | Hillsborough, Florida |
| FL Queue Project 130 — Battery in Hillsborough, Florida | 130 | Battery | 75.0 MW | active | Hillsborough, Florida |
| FL Queue Project 80 — Solar in Hillsborough, Florida | 80 | Solar | 74.9 MW | withdrawn | Hillsborough, Florida |
| FL Queue Project 78 — Solar in Hillsborough, Florida | 78 | Solar | 74.9 MW | withdrawn | Hillsborough, Florida |
| FL Queue Project 71 — Solar in Pasco, Florida | 71 | Solar | 74.9 MW | operational | Pasco, Florida |
| Long Branch Solar | 68472_1 | Solar | 74.9 MW | operational | Manatee, Florida |
| Southeast Queue Project 96A — Solar in Hillsborough, Florida | 96A | Solar | 74.9 MW | withdrawn | Hillsborough, Florida |
| FL Queue Project 72 — Solar in Polk, Florida | 72 | Solar | 74.9 MW | operational | Polk, Florida |
| Southeast Queue Project 95A — Solar in Hillsborough, Florida | 95A | Solar | 74.9 MW | withdrawn | Hillsborough, Florida |
| Southeast Queue Project 95B — Solar in Hillsborough, Florida | 95B | Solar | 74.9 MW | withdrawn | Hillsborough, Florida |
| FL Queue Project 92 — Solar in Hillsborough, Florida | 92 | Solar | 74.9 MW | withdrawn | Hillsborough, Florida |
| FL Queue Project 81 — Solar in Hillsborough, Florida | 81 | Solar | 74.9 MW | withdrawn | Hillsborough, Florida |
| Southeast Queue Project 93A — Solar in Polk, Florida | 93A | Solar | 74.9 MW | withdrawn | Polk, Florida |
| Southeast Queue Project 93B — Solar in Polk, Florida | 93B | Solar | 74.9 MW | withdrawn | Polk, Florida |
| FL Queue Project 94 — Solar in Hillsborough, Florida | 94 | Solar | 74.9 MW | withdrawn | Hillsborough, Florida |
| FL Queue Project 65 — Solar in Hillsborough, Florida | 65 | Solar | 74.9 MW | withdrawn | Hillsborough, Florida |
| FL Queue Project 79 — Solar in Hillsborough, Florida | 79 | Solar | 74.9 MW | withdrawn | Hillsborough, Florida |
| Southeast Queue Project 96B — Solar in Hillsborough, Florida | 96B | Solar | 74.9 MW | withdrawn | Hillsborough, Florida |
| Wimauma Solar and Battery Storage | 61667_1 | Solar | 74.8 MW | operational | Hillsborough, Florida |
| Jamison Solar (FL) | 64631_1 | Solar | 74.5 MW | operational | Polk, Florida |
| Lithia Solar | 61663_GEN1 | Solar | 74.5 MW | operational | Hillsborough, Florida |
| FL Queue Project 108 — Solar in Pasco, Florida | 108 | Solar | 74.5 MW | withdrawn | Pasco, Florida |
| FL Queue Project 122 — Solar in Hillsborough, Florida | 122 | Solar | 74.5 MW | active | Hillsborough, Florida |
| FL Queue Project 74 — Solar in Polk, Florida | 74 | Solar | 74.5 MW | withdrawn | Polk, Florida |
| FL Queue Project 11 — Solar in Polk, Florida | 11 | Solar | 74.5 MW | operational | Polk, Florida |
| FL Queue Project 1 — Solar in Hillsborough, Florida | 1 | Solar | 74.5 MW | operational | Hillsborough, Florida |
| Lake Mabel Solar and Battery Storage | 66128_1 | Solar | 74.5 MW | operational | Polk, Florida |
| FL Queue Project 21 — Solar in Polk, Florida | 21 | Solar | 74.5 MW | withdrawn | Polk, Florida |
| FL Queue Project 7 — Solar in Manatee, Florida | 7 | Solar | 74.5 MW | withdrawn | Manatee, Florida |
| FL Queue Project 20 — Solar in Hillsborough, Florida | 20 | Solar | 74.5 MW | operational | Hillsborough, Florida |
| Bullfrog Creek Solar | 67203_1 | Solar | 74.5 MW | operational | Hillsborough, Florida |
| FL Queue Project 112 — Solar in Hillsborough, Florida | 112 | Solar | 74.5 MW | active | Hillsborough, Florida |
| Southeast Queue Project 64A — Solar in Hillsborough, Florida | 64A | Solar | 74.5 MW | withdrawn | Hillsborough, Florida |
| FL Queue Project 6 — Solar in Manatee, Florida | 6 | Solar | 74.5 MW | withdrawn | Manatee, Florida |
| FL Queue Project 59 — Solar in Polk, Florida | 59 | Solar | 74.5 MW | operational | Polk, Florida |
| FL Queue Project 86 — Solar in Pasco, Florida | 86 | Solar | 74.5 MW | withdrawn | Pasco, Florida |
| Cottonmouth Ranch Solar | 68551_1 | Solar | 74.5 MW | operational | Hillsborough, Florida |
| FL Queue Project 109 — Solar in Polk, Florida | 109 | Solar | 74.5 MW | withdrawn | Polk, Florida |
| FL Queue Project 66 — Solar in Hillsborough, Florida | 66 | Solar | 74.5 MW | operational | Hillsborough, Florida |
| FL Queue Project 107 — Solar in Pasco, Florida | 107 | Solar | 74.5 MW | withdrawn | Pasco, Florida |
| FL Queue Project 43 — Solar in Polk, Florida | 43 | Solar | 74.5 MW | withdrawn | Polk, Florida |
| Southeast Queue Project 64B — Solar in Hillsborough, Florida | 64B | Solar | 74.5 MW | withdrawn | Hillsborough, Florida |
| Southeast Queue Project 1 — Solar in an unlisted county, the U.S. | 1 | Solar | 74.5 MW | operational | — |
| Southeast Queue Project 44A — Solar in Manatee, Florida | 44A | Solar | 74.5 MW | withdrawn | Manatee, Florida |
| FL Queue Project 4 — Solar in Polk, Florida | 4 | Solar | 74.5 MW | withdrawn | Polk, Florida |
| FL Queue Project 126 — Solar in Polk, Florida | 126 | Solar | 74.5 MW | active | Polk, Florida |
| FL Queue Project 8 — Solar in Manatee, Florida | 8 | Solar | 74.5 MW | withdrawn | Manatee, Florida |
| FL Queue Project 56 — Solar in Hillsborough, Florida | 56 | Solar | 74.5 MW | withdrawn | Hillsborough, Florida |
| FL Queue Project 10 — Solar in Manatee, Florida | 10 | Solar | 74.5 MW | withdrawn | Manatee, Florida |
| FL Queue Project 9 — Solar in Manatee, Florida | 9 | Solar | 74.5 MW | withdrawn | Manatee, Florida |
| FL Queue Project 102 — Solar in Hillsborough, Florida | 102 | Solar | 74.5 MW | withdrawn | Hillsborough, Florida |
| FL Queue Project 28 — Solar in Hillsborough, Florida | 28 | Solar | 74.5 MW | withdrawn | Hillsborough, Florida |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; teco-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through Tampa Electric Company.
Start tracking with interXdata