Southeast Queue Project 127 — Other in Lake, Florida

Southeast Queue Project 127 — Other in Lake, Florida is a 11.0 MW other interconnection project in Lake, Florida with a current status of withdrawn. It is proposed to connect at Enola Substation.

11.0 MWCapacity
WithdrawnStatus
SoutheastMarket
OtherTechnology

Project facts

Canonical nameSoutheast Queue Project 127 — Other in Lake, Florida
Queue ID127
Statuswithdrawn
Source statuswithdrawn
MarketSoutheast
TechnologyOther
Capacity11.0 MW
StateFlorida
CountyLake
Point of interconnectionEnola Substation
Requested (queue) date2013-10-25
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata