Southeast Queue Project 137 — Gas in Pasco, Florida

Southeast Queue Project 137 — Gas in Pasco, Florida is a 575.0 MW gas interconnection project in Pasco, Florida with a current status of active. It is proposed to connect at Hudson N Substation.

575.0 MWCapacity
ActiveStatus
SoutheastMarket
GasTechnology

Project facts

Canonical nameSoutheast Queue Project 137 — Gas in Pasco, Florida
Queue ID137
Statusactive
Source statusactive
MarketSoutheast
TechnologyGas
Capacity575.0 MW
StateFlorida
CountyPasco
Point of interconnectionHudson N Substation
Requested (queue) date2015-11-10
Proposed in-service date2020-06-01
Operational date
Withdrawn date
DeveloperSeminole Electric Cooperative, Inc.
Utility / transmission ownerDuke Energy Progress

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.