Southeast Queue Project 141 — Solar in Citrus, Florida
Southeast Queue Project 141 — Solar in Citrus, Florida is a 50.0 MW solar interconnection project in Citrus, Florida with a current status of withdrawn. It is proposed to connect at Floral City Substation.
50.0 MWCapacity
WithdrawnStatus
SoutheastMarket
SolarTechnology
Project facts
| Canonical name | Southeast Queue Project 141 — Solar in Citrus, Florida |
|---|---|
| Queue ID | 141 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | Southeast |
| Technology | Solar |
| Capacity | 50.0 MW |
| State | Florida |
| County | Citrus |
| Point of interconnection | Floral City Substation |
| Requested (queue) date | 2016-05-04 |
| Proposed in-service date | 2021-06-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Duke Energy Progress |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata