Southeast Queue Project 180C — Solar in an unlisted county, the U.S. is a 74.5 MW solar interconnection project with a current status of operational. It is proposed to connect at Highbanks Substation 115 kV.

74.5 MWCapacity
OperationalStatus
SoutheastMarket
SolarTechnology

Project facts

Canonical nameSoutheast Queue Project 180C — Solar in an unlisted county, the U.S.
Queue ID180C
Statusoperational
Source statusoperational
MarketSoutheast
TechnologySolar
Capacity74.5 MW
State
County
Point of interconnectionHighbanks Substation 115 kV
Requested (queue) date2017-04-10
Proposed in-service date2018-12-31
Operational date
Withdrawn date
DeveloperDuke Energy Florida, LLC
Utility / transmission ownerDuke Energy Progress

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata