Southeast Queue Project 193 — Solar in Levy, Florida

Southeast Queue Project 193 — Solar in Levy, Florida is a 70.0 MW solar interconnection project in Levy, Florida with a current status of active. It is proposed to connect at Bronson-Chiefland.

70.0 MWCapacity
ActiveStatus
SoutheastMarket
SolarTechnology

Project facts

Canonical nameSoutheast Queue Project 193 — Solar in Levy, Florida
Queue ID193
Statusactive
Source statusactive
MarketSoutheast
TechnologySolar
Capacity70.0 MW
StateFlorida
CountyLevy
Point of interconnectionBronson-Chiefland
Requested (queue) date2017-08-11
Proposed in-service date2021-11-30
Operational date
Withdrawn date
DeveloperOrigis Development LLC
Utility / transmission ownerDuke Energy Progress

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata