Southeast Queue Project 196564 — Solar in Davidson, North Carolina
Southeast Queue Project 196564 — Solar in Davidson, North Carolina is a 80.0 MW solar interconnection project in Davidson, North Carolina with a current status of active. It is proposed to connect at High Point White 100kV (BURL IND BURL KNIT FAB DIV.
Project facts
| Canonical name | Southeast Queue Project 196564 — Solar in Davidson, North Carolina |
|---|---|
| Queue ID | 196564 |
| Status | active |
| Source status | active |
| Market | Southeast |
| Technology | Solar |
| Capacity | 80.0 MW |
| State | North Carolina |
| County | Davidson |
| Point of interconnection | High Point White 100kV (BURL IND BURL KNIT FAB DIV |
| Requested (queue) date | 2022-01-21 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Duke Energy Progress |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.