Southeast Queue Project 20230825003 — Solar in Orangeburg, South Carolina

Southeast Queue Project 20230825003 — Solar in Orangeburg, South Carolina is a 88.0 MW solar interconnection project in Orangeburg, South Carolina with a current status of withdrawn. It is proposed to connect at Cope ‚Äì Orangeburg East 230kV line.

88.0 MWCapacity
WithdrawnStatus
SoutheastMarket
SolarTechnology

Project facts

Canonical nameSoutheast Queue Project 20230825003 — Solar in Orangeburg, South Carolina
Queue ID20230825003
Statuswithdrawn
Source statuswithdrawn
MarketSoutheast
TechnologySolar
Capacity88.0 MW
StateSouth Carolina
CountyOrangeburg
Point of interconnectionCope – Orangeburg East 230kV line
Requested (queue) date
Proposed in-service date2027-09-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerDominion

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata