Southeast Queue Project 20230829008 — Solar+Battery in Colleton, South Carolina

Southeast Queue Project 20230829008 — Solar+Battery in Colleton, South Carolina is a 74.9 MW solar+battery interconnection project in Colleton, South Carolina with a current status of withdrawn. It is proposed to connect at Cope ‚Äì Canadys 230 kV.

74.9 MWCapacity
WithdrawnStatus
SoutheastMarket
Solar+BatteryTechnology

Project facts

Canonical nameSoutheast Queue Project 20230829008 — Solar+Battery in Colleton, South Carolina
Queue ID20230829008
Statuswithdrawn
Source statuswithdrawn
MarketSoutheast
TechnologySolar+Battery
Capacity74.9 MW
StateSouth Carolina
CountyColleton
Point of interconnectionCope – Canadys 230 kV
Requested (queue) date
Proposed in-service date2027-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerDominion

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata