Southeast Queue Project 22 — Gas in an unlisted county, Florida

Southeast Queue Project 22 — Gas in an unlisted county, Florida is a 136.0 MW gas interconnection project with a current status of active. It is proposed to connect at MGS Switchyard.

136.0 MWCapacity
ActiveStatus
SoutheastMarket
GasTechnology

Project facts

Canonical nameSoutheast Queue Project 22 — Gas in an unlisted county, Florida
Queue ID22
Statusactive
Source statusactive
MarketSoutheast
TechnologyGas
Capacity136.0 MW
StateFlorida
County
Point of interconnectionMGS Switchyard
Requested (queue) date2018-08-30
Proposed in-service date2019-12-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerSeminole Electric Cooperative

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata