Southeast Queue Project 23 — Solar in an unlisted county, Florida

Southeast Queue Project 23 — Solar in an unlisted county, Florida is a 74.5 MW solar interconnection project with a current status of withdrawn. It is proposed to connect at Seminole Generating Station/ Rice 230.

74.5 MWCapacity
WithdrawnStatus
SoutheastMarket
SolarTechnology

Project facts

Canonical nameSoutheast Queue Project 23 — Solar in an unlisted county, Florida
Queue ID23
Statuswithdrawn
Source statuswithdrawn
MarketSoutheast
TechnologySolar
Capacity74.5 MW
StateFlorida
County
Point of interconnectionSeminole Generating Station/ Rice 230
Requested (queue) date2018-10-17
Proposed in-service date2020-12-31
Operational date
Withdrawn date2020-03-19
Developer
Utility / transmission ownerSeminole Electric Cooperative

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata