Southeast Queue Project 232 — Hydro in Marion, Tennessee

Southeast Queue Project 232 — Hydro in Marion, Tennessee is a 4.0 MW hydro interconnection project in Marion, Tennessee with a current status of operational.

4.0 MWCapacity
OperationalStatus
SoutheastMarket
HydroTechnology

Project facts

Canonical nameSoutheast Queue Project 232 — Hydro in Marion, Tennessee
Queue ID232
Statusoperational
Source statusoperational
MarketSoutheast
TechnologyHydro
Capacity4.0 MW
StateTennessee
CountyMarion
Point of interconnection
Requested (queue) date2012-02-06
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerTennessee Valley Authority

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata