Southeast Queue Project 237 — Solar in Pasco, Florida

Southeast Queue Project 237 — Solar in Pasco, Florida is a 74.5 MW solar interconnection project in Pasco, Florida with a current status of active. It is proposed to connect at Trilby Substation.

74.5 MWCapacity
ActiveStatus
SoutheastMarket
SolarTechnology

Project facts

Canonical nameSoutheast Queue Project 237 — Solar in Pasco, Florida
Queue ID237
Statusactive
Source statusactive
MarketSoutheast
TechnologySolar
Capacity74.5 MW
StateFlorida
CountyPasco
Point of interconnectionTrilby Substation
Requested (queue) date2018-07-17
Proposed in-service date2021-12-30
Operational date
Withdrawn date
DeveloperFlorida Renewable Partners, LLC
Utility / transmission ownerDuke Energy Progress

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata