Southeast Queue Project 24 — Gas in Polk, Florida

Southeast Queue Project 24 — Gas in Polk, Florida is a 70.0 MW gas interconnection project in Polk, Florida with a current status of operational.

70.0 MWCapacity
OperationalStatus
SoutheastMarket
GasTechnology

Project facts

Canonical nameSoutheast Queue Project 24 — Gas in Polk, Florida
Queue ID24
Statusoperational
Source statusoperational
MarketSoutheast
TechnologyGas
Capacity70.0 MW
StateFlorida
CountyPolk
Point of interconnection
Requested (queue) date2005-06-07
Proposed in-service date2011-06-01
Operational date2006-06-30
Withdrawn date
DeveloperNorthernStar
Utility / transmission ownerDuke Energy Progress

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.