Southeast Queue Project 248A — Solar in Jackson, Florida

Southeast Queue Project 248A — Solar in Jackson, Florida is a 74.5 MW solar interconnection project in Jackson, Florida with a current status of operational. It is proposed to connect at Marianna - West Grand Ridge (PS) 115kV line.

74.5 MWCapacity
OperationalStatus
SoutheastMarket
SolarTechnology

Project facts

Canonical nameSoutheast Queue Project 248A — Solar in Jackson, Florida
Queue ID248A
Statusoperational
Source statusoperational
MarketSoutheast
TechnologySolar
Capacity74.5 MW
StateFlorida
CountyJackson
Point of interconnectionMarianna - West Grand Ridge (PS) 115kV line
Requested (queue) date2017-04-14
Proposed in-service date
Operational date2021-12-31
Withdrawn date
DeveloperFPL
Utility / transmission ownerFlorida Power & Light

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.