Southeast Queue Project 292 — Solar in Lake, Tennessee

Southeast Queue Project 292 — Solar in Lake, Tennessee is a 80.0 MW solar interconnection project in Lake, Tennessee with a current status of active. It is proposed to connect at Highway 412-New Tiptonville 161-kV TL.

80.0 MWCapacity
ActiveStatus
SoutheastMarket
SolarTechnology

Project facts

Canonical nameSoutheast Queue Project 292 — Solar in Lake, Tennessee
Queue ID292
Statusactive
Source statusactive
MarketSoutheast
TechnologySolar
Capacity80.0 MW
StateTennessee
CountyLake
Point of interconnectionHighway 412-New Tiptonville 161-kV TL
Requested (queue) date2016-04-19
Proposed in-service date2023-03-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerTennessee Valley Authority

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.