Southeast Queue Project 31 — Coal in Taylor, Florida

Southeast Queue Project 31 — Coal in Taylor, Florida is a 850.0 MW coal interconnection project in Taylor, Florida with a current status of withdrawn. It is proposed to connect at Perry Substation.

850.0 MWCapacity
WithdrawnStatus
SoutheastMarket
CoalTechnology

Project facts

Canonical nameSoutheast Queue Project 31 — Coal in Taylor, Florida
Queue ID31
Statuswithdrawn
Source statuswithdrawn
MarketSoutheast
TechnologyCoal
Capacity850.0 MW
StateFlorida
CountyTaylor
Point of interconnectionPerry Substation
Requested (queue) date2005-10-21
Proposed in-service date2012-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata