Southeast Queue Project 346 — Solar+Battery in Bradford, Florida

Southeast Queue Project 346 — Solar+Battery in Bradford, Florida is a 74.5 MW solar+battery interconnection project in Bradford, Florida with a current status of withdrawn. It is proposed to connect at Bradford-Quasar 230kV.

74.5 MWCapacity
WithdrawnStatus
SoutheastMarket
Solar+BatteryTechnology

Project facts

Canonical nameSoutheast Queue Project 346 — Solar+Battery in Bradford, Florida
Queue ID346
Statuswithdrawn
Source statuswithdrawn
MarketSoutheast
TechnologySolar+Battery
Capacity74.5 MW
StateFlorida
CountyBradford
Point of interconnectionBradford-Quasar 230kV
Requested (queue) date2018-05-04
Proposed in-service date2022-06-01
Operational date2022-06-01
Withdrawn date
DeveloperThird Party
Utility / transmission ownerFlorida Power & Light

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata